Assessment of Energy Supply to the Yamal Peninsula Based on Fuzzy Multicriteria Analysis
DOI:
https://doi.org/10.17059/ekon.reg.2022-4-17Keywords:
pre-project research, multicriteria analysis, fuzzy sets, Saaty scale, expert opinions, infrastructure of new development areas in the Arctic, energy sourcesAbstract
Provision of useful energy is the most important condition for realising the potential of underdeveloped regions. For new development areas, including the Yamal Peninsula, there are various energy alternatives. Based on well-known basic approaches, the article proposes a procedure for formalising the analysis of alternatives mostly using qualitative initial data. At the pre-project stage, limited and fuzzy information (predominantly in the form of expert opinions) is accessible. To achieve our goal, six criteria for export assessment were selected and further processed using fuzzy multicriteria decision-making models based on fuzzy multicriteria analysis of alternatives in order to formalise logical reasoning with vague or imprecise statements. Due to insufficient measurements for constructing fuzzy sets, linguistic estimates of intuitive or logical pairwise comparisons were formalised using the Bellman–Zadeh model, the Saaty scale and the construction of membership functions. The fuzzy set was obtained by finding the eigenvector and the largest eigenvalue for the pairwise comparison matrix. Implementation of the maximin criterion along with the concession matrix allowed selecting alternatives when obtaining the same or similar estimates. As a result, the study showed the priority of diversification of primary energy source to provide useful energy to consumers in Yamal. The most preferable source is atomic energy. In second place are gas turbine technologies, which are significantly ahead of wind energy sources. Diesel generators are considered the least favourable. Thus, the results of fuzzy modelling correspond with the explanatory factors of choice. The research findings can be used to prepare comprehensive strategies and schemes for location of industries and the energy infrastructure in remote Arctic territories.
References
Alaqeel, T. & Suryanarayanan, S. (2018). A fuzzy Analytic Hierarchy Process algorithm to prioritize Smart Grid technologies for the Saudi electricity infrastructure. Sustainable Energy, Grids and Networks, 13, 122-133.
Awasthi, A., Govindan, K. & Gold, S. (2018). Multi-tier sustainable global supplier selection using a fuzzy AHP-VIKOR based approach. International Journal of Production Economics, 195, 106-117.
Batenin, V. M., Bushuev, V. V. & Voropai, N. I. (Eds.). (2017). Innovatsionnaya elektroenergetika — 21 [Innovation of electric power industry — 21]. Moscow: Energiya Publishing Center, 584. (In Russ.)
Bellman, R. & Zadeh, L. (1976). Decision-making in a fuzzy environment. In: Voprosy analiza i protsedury prinyatiya resheniy [Issues of analysis and decision-making procedures] (pp. 172-215). Moscow: Peace. (In Russ.)
Bovo, C., Delfanti, M., Merlo, M. & Pasquadibisceglie, M. S. (2007). Coordination of Transmission Network and New Power Plants. In: 2007 IEEE Lausanne Power Tech (pp. 1356-1361). Lausanne, Switzerland.
Chernov, V. G. (2001). Analysis of product profiles for fuzzy conformity assessments. Pribory i sistemy. Upravlenie, kontrol, diagnostika [Instruments and Systems: Monitoring, Control, and Diagnostics], 10, 61-66. (In Russ.)
Domnikov, A. Yu., Chebotareva, G. S. & Khomenko, P. M. (2014). A risk-based approach to capital management energy company. Vestnik UrFU. Seriya ekonomika i upravlenie [Bulletin of UrFU. Economics and Management Series], 6, 150–160. (In Russ.)
Hu, Zh. (2002). Study on Methodology of Generation Expansion Planning for Power Restructuring. In: Power Con’2002 (pp. 388−392). Kunming, China.
Khorasani, S. (2018). Green supplier evaluation by using the integrated Fuzzy AHP model and Fuzzy Copras. Process Integration and Optimization for Sustainability, 2, 17-25.
Kutovoy, G. P. (2000). The concept of structural reform in the electric power industry — a competitive market in Russia. Vestnik FEK Rossii [Vestnik of the FEC of Russia], 3, 16-19. (In Russ.)
Lazhentsev, V. N. (2018). Socio-Economic Space and Territorial Development of the North and the Arctic of Russia. Ekonomika regiona [Economy of Region], 14(2), 353-365. DOI: 10.17059/2018-2-2 (In Russ.)
Leksin, V. N. & Profiryev, B. N. (2017). Socio-Economic Priorities of Sustainable Development of Russian Arctic Macro-Region. Ekonomika regiona [Economy of Region], 13(4), 985-1004. DOI: 10.17059/2017-4-2. (In Russ.)
Leonenkov, A. (2005). Nechetkoe modelirovanie v srede Matlab i fuzzyTECH [Fuzzy modeling in Matlab and fuzzyTECH). Saint-Petersburg: BHV-Peterburg, 719. (In Russ.)
Limbu, T. R., Saha, T. K. & McDonald, J. D. F. (2007). Cost / Benefit Analysis of Generation Investments Considering System Constraints. In: 2007 Power Engineering Society General Meeting (pp. 268−275). Tampa, Florida.
Mahjouri, M., Ishak, M., Torabian, A., Manaf, L., Halimoon, N. & Ghoddusi, J. (2017). Optimal selection of Iron and Steel wastewater treatment technology using integrated multi-criteria decision-making techniques and fuzzy logic. Process Safety and Environmental Protection, 107, 54-68.
Makarov, A. A. (2020). 50 Years of Systems Analysis of Energy Development in the USSR and Russia. Energy Systems Research, 3(2), 43-49. DOI: 10.38028/esr.2020.02.0006.
Melentev, L. A. (1984). Sistemnye issledovaniya v energetike [System research in the energy sector]. Moscow: Science, 456. (In Russ.)
Nazari, S., Fallah, M., Kazemipoor, H. & Salehipour, A. (2018). A fuzzy inference- fuzzy analytic hierarchy process-based clinical decision support system for diagnosis of heart diseases. Expert Systems with Applications, 95, 261-271.
Petrov, M. B., Serkov L. A., Kozhov K. B. Analysis of the spatial features of regional power consumption in the Russian Federation. Prikladnaya ekonometrika [Applied Econometrics], 61, 5–27. DOI: 10.22394/1993-7601-2021-61-5-27 (In Russ.)
Petrov, M. B., Serkov, L. A. & Kozhov, K. B. (2022). Selection of priority projects for the development of the transport network based on fuzzy logic. Vestnik Rostovskogo gosudarstvennogo universiteta putey, 86(2), 161-175. (In Russ.)
Pizengolts, V. M. & Kanush, A. D. (2022). Features of the restructuring of enterprises in the energy industry. Problemy teorii i praktiki upravleniya [International journal of management theory and practice], 1, 136-150. (In Russ.)
Robinson, J. (1986). The economics of imperfect competition [Ekonomicheskaya teoriya nesovershennoy konkurentsii]. Trans. Moscow: Progress, 450. (In Russ.)
Rodionova, V. G. (2017). Economics and technology of floating nuclear thermal power plants: FNTPP “Academician Lomonosov”. Gumanitarnyy vestnik [Humanitarian Bulletin], 10. DOI: 10.18698/2306-8477-2017-10-47 (In Russ.)
Saaty, T. (1993). The Analytic Hierarchy Process [Prinyatie resheniy. Metod analiza ierarkhiy]. Trans. Moscow: Radio and Communications, 314. (In Russ.)
Samanlioglu, F. & Ayag, Z. (2017). A fuzzy AHP-PROMETHEE II approach for evaluation of solar power plant location alternatives in Turkey. Journal of Intelligent & Fuzzy Systems, 33, 859-871.
Sasaki, H., Kubokawa, J., Yorino, N. & Sugiyama, K. (1999). Multi-Area Generation Expension Planning by Means of Multi-Objective Fuzzy Linear Programming. In: 13th PSCC (pp. 762−769). Trondheim, Norvey.
Shtovba, S. (2007). Proektirovanie nechetkikh sistem sredstvami Matlab [Designing fuzzy systems using Matlab]. Moscow: Hotline–Telecom, 285. (In Russ.)
Tatarkin, A. I. & Makarov, A. A. (Eds.) (2004). Modelirovanie sostoyaniya i prognozirovanie razvitiya regionalnykh ekonomicheskikh i energeticheskikh sistem [Modeling the state and forecasting the development of regional economic and energy systems]. Moscow: CJSC «Publishing House «Economics», 462. (In Russ.)
Volkenau, I. M. (2005). On managing the development of the UES of Russia in new conditions. Energetik, 5, 16−19. (In Russ.)
Volkov, E. P. & Barinov, V. A. (2006). Decision making electric power industry development of Russia under conditions of its liberalization. Izvestiya RAN. Energetika [ Thermal Engineering], 6, 3−19. (In Russ.)
Voropay, N. I. (Ed.). (2015). Obosnovanie razvitiya elektroenergeticheskikh sistem: Metodologiya, modeli, metody, ikh ispolzovanie [Justification of the development of electric power systems: Methodology, models, methods, their use]. Novosibirsk: Nauka. (In Russ.)
Yeh, C. (2017). Existence of interval, triangular, and trapezoidal approximations of fuzzy numbers under a general condition. Fuzzy Sets and Systems, 310, 1-13.
Zhukov, O. V. & Cherepovitsyn, A. E. (2021). Global trends and target indicators of economic development of industrial gas production complexes in the Arctic. Sever i rynok: formirovanie ekonomicheskogo poryadka [The North and the Market: Forming the Economic Order], 4, 128-139. DOI: 10.37614/2220-802X.4.2021. (In Russ.)
Zimmer, K., Fröhling, M., Breun, P. & Schultmann, F. (2017). Assessing social risks of global supply chains: A quantitative analytical approach and its application to supplier selection in the German automotive industry. Journal of Cleaner Production, 149, 96-109.